coPod Housing System

Over the past few years the practice has been involved in the development and research of Off-Site construction ideas for the rapid delivery of affordable housing. Part of this research includes the development of the coPod housing system, a unique range of offsite manufacture pods that contain all of the essential elements required for a modern home.
This particular house has been specifically designed to be transported in containers and shipped overseas. The external envelope and floors are constructed of solid timber cross laminated panels that are bolted together and left exposed on the inside. A combination of pods, containing Kitchen/WC/Stair at ground floor and Bathroom/Stair at the upper levels, sit in the centre of the plan servicing each room of the house with ventilation, power, communications and lighting. This avoids the need for any plumbing or electrical work on site, so the whole house takes 3 days to erect. The external finish can be applied in timber, brick or render to suit the local context.
New build house in Greece
Work has started on a new built house designed by co-lab architects on top of a hill near Athens in Greece. The house overlooks the Mediterranean from the hill top and is due to be finished by next summer.
Islington housing competition
co-lab architects have submitted an entry for the Islington Housing Design Competition. We used the competition to further test and develop our ideas for the co-Pod housing system, it worked suprisingly well on quite a small and difficult site.
TV Drama
In the summer we designed a new clothes shop for the Choi Ji Young fashion chain in South Korea. Now a Korean film company are going to use our shop as one of their sets for a new drama with some of the most famous actors in Asia. We’re told the production company were looking for a ‘cool’ modern retail interior, we’re glad they thought our shop fitted the brief.
We haven’t even photographed the shop ourselves yet, so it looks like a good start to 2010.
Interestingly this is the first project that we have done as an office where we didn’t produce any drawings, the contractor worked completely from a Sketchup computer model.